🔄 A new version is available

AddisBOQ

Home New BOQ 📋 Site Log 📖 Builder's Guide Customer Support Contact Organization Report a Bug What's Coming Request a Feature About Terms & Disclaimer

Upcoming Professional Features

Traditional Ethiopian BOQ Structure, Consultant-Grade Excel Export, PDF Reports, Mechanical Installation (Elevator for G+5 and above), Carpentry, Aluminium Works, and Glazing Sections.

📊
1

TeleBirr number

+251 913 265 488

2

Enter your TeleBirr transaction ID below and click Unlock

⚠️ Please enter a valid transaction ID.

🔒 Your payment is verified instantly and securely. Your BOQ data stays private on your device.

AddisBOQ
የህንፃ ወጪ ግምት
በደቂቃዎች
Professional BOQ Calculator for Ethiopian Construction
🏙️ 11 ከተሞች 🏗️ እስከ 15 ወለል ⚡ ከ 5 ደቂቃ በታች
✂️ Rebar Cutting Optimizer — Play Store 📋 Site Log — Daily Reports & Payments
ስለ AddisBOQ / About
📐

ስለ AddisBOQ እና Addis Engineering

ስለ ድረ-ገጹ፣ እና ስለ አገልግሎቶቹ የበለጠ ይወቁ →

የእኛ አገልግሎቶች / Our Tools
📊

AddisBOQ — BOQ Calculator

Professional Bill of Quantities with Excel export.

📋

Site Log

Daily site reports, subcontractor measurement, and payment tracking. 14 days free.

✂️

Rebar Cut Optimizer

Minimize steel wastage with smart cutting optimization. Available on Google Play.

ማህበረሰብ / Community
✈️

Telegram Channel

Join our channel for updates, tips and new features. ለዜናዎች እና አዲስ አፕዴቶች ቻናላችንን ይቀላቀሉ።

እርዳታ / Help
📖

Ethiopian Builder's Guide

Real BOQ mistakes, daily reporting, variations, and EBCS / ES EN codes — lessons from actual sites.

📋

Building Permit Guide

The street-width rule, required documents, and realistic timelines for getting your permit approved.

Frequently Asked Questions

BOQ basics, construction cost factors, and how AddisBOQ works.

Step 1 of 5
Project Information (የፕሮጀክት መረጃ)
Basic details about your building project.
Project Details (የፕሮጀክት ዝርዝር)
Step 2 of 5
Building Structure (የህንፃ መዋቅር)
Dimensions and structural system of the building.
Floor Configuration (የወለል አቀማመጥ)
Foundation Type (የመሰረት አይነት)
Step 3 of 5
Finishes & Materials (የፍፃሜ ስራዎች)
Wall, roof, floor, and paint specifications.
External Wall Material (የውጭ ግድግዳ)
Outer Door & Window Profile (የውጭ በርና መስኮት)
Internal Partition Wall (የውስጥ ክፍፍል ግድግዳ)
Roof Type (የጣሪያ አይነት)
Steel Roof Truss (የብረታ ብረት ጣሪያ)
Mechanical Installation (ሊፍት)
Floor Finish (የወለል ሽፋን)
Paint Quality (የቀለም ጥራት)
Step 4 of 5
Electrical & Sanitary
MEP installations — electrical wiring and plumbing/sanitary works.
Electrical Installation (የኤሌክትሪክ ስራ)
Sanitary & Plumbing Works (የሳኒቴሪ ስራ)
Step 5 of 5
Review & Calculate
Confirm your inputs, then generate the BOQ.
Summary of Inputs
📋
Unit rates are based on current Ethiopian market prices as of June 2026. Rates are updated periodically to reflect inflation. Always verify with local suppliers before procurement.

BOQ — Villa G+3

Location:
Total Area:
Date:
GRAND TOTAL (incl. VAT 15%)
Want the complete BOQ?
Every line item, quantity, and rate — ready for your contractor
🔒
The full BOQ is ready for you
Get every line item, quantity, and rate — ready to hand to your contractor.